Abstract
In modern power system relays and circuit breakers need to be coordinated to minimize unnecessary outages, since protective relays are one of the equipment in the power system. Fault detection of any abnormal activity and protection of the area under its observation. Relays coordination is necessary to reduce unnecessary outages which must be done in a manner that the relay nearest to the point of fault operates faster, in the event of failure, before backup protection does. This paper presents optimal setting and coordination of overcurrent relays to improve fault detection and clearance on the Rumuodomaya 11KV Distribution Network in Rivers state. Calculations and simulation were realized in study. Electrical Transient Analysis Program (ETAP 20.0) was used to simulate both the setting and relay coordination studies, so as to improve on the fault detectionon coordination sequence and time of operation Genetic Algorithm (GA) toolbox embedded in MATLAB. When 3-phase fault was initiated at FGC feeder, tripping sequence violation occurred revealing a total time of operation between the primary relay and its backup as 109ms, 346ms, 494ms and 1055ms, with order of tripping from 33kV line breaker to 33kV control panel to T1, 11kV incomer and to FGC feeder breaker respectively. Whereas, when the relay coordination were initiated the time of operation between primary relay and backup relays now increased as 144ms, 342ms, 454ms and 702ms, and it showed the right order of relay tripping coordination for FGC feeder breaker to 11kV incomer breaker to 33kV control panel breaker and to 33kV line breaker. Again, correct sequence of breaker tripping 1234 orders achieved in optimized case, the speed of operation was also improved respectively.

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Copyright (c) 2025 Engineering Research journal