Work Value Management Dimensions and Organizational Sustainability: A Cross-Sectional Correlational Analysis of Construction Firms in Port Harcourt, Nigeria.
PDF

Keywords

Work value management; organizational sustainability; goal communication; skills evaluation; stakeholder theory; construction industry.

How to Cite

Onwuanaku, B., & Horsfall, S. (2026). Work Value Management Dimensions and Organizational Sustainability: A Cross-Sectional Correlational Analysis of Construction Firms in Port Harcourt, Nigeria. Scholarly Journal of Management Sciences Research, 5(2), 110-128. https://doi.org/10.46654/8pewjt81

Abstract

This study examines the relationship between four dimensions of work value management (goal communication, skills evaluation, collaboration analysis and stakeholders' gain) and two measures of organizational sustainability (profitability and patronage). A cross-sectional descriptive survey was conducted among managerial and supervisory staff of seven leading construction companies in Port Harcourt, Rivers State. A census of 151 staff was attempted and 130 usable questionnaires were retrieved (86.1%). A self-developed, four-point closed-ended instrument was used; internal consistency was assessed with Cronbach's alpha and relationships were tested with the Pearson product-moment correlation coefficient in SPSS 20.0 at the 0.05 level. All four dimensions of work value management were rated to a high extent (construct means 3.39 to 3.62 on a four-point scale). Every dimension correlated strongly and positively with both profitability and patronage (r = .881 to .989, p < .001), and the eight null hypotheses were rejected. Skills evaluation showed the strongest association with profitability (r = .989) and collaboration analysis the weakest association with patronage (r = .881). The study extends the human-relations and stakeholder literatures to a sector in which firm survival depends on the durability of delivered projects and on repeat patronage. The correlation magnitudes are unusually high and are interpreted with caution, because shared-method variance and scale redundancy may inflate them. Practical implications for construction managers and directions for stronger designs are provided.

PDF
Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Copyright (c) 2026 Scholarly Journal of Management Sciences Research

6 1